Real estate and project development:
- Infrastructure and Industrial Projects
- Commercial and Residential Projects
- Master Planning of Public Sector Projects
32Group takes its roots from building multi purpose and heavy steel structure projects
32Group participated in the construction of Tehran Cable project in the 1970’s. 7500 meters of cable cars was built from 1900 meters to 3740 meters of altitude
32Group develops and builds multipurpose industrial facilities and factories (Automotive, Cement, Logistics etc)
Car assembly facility with European specification. Built up area of 7000sqm
Two adjacent Cement processing plants. Built up area 28000sqm
Heller Tower cooling systems for Power Plants. Built up area 3000sqm
32Group has developed floating ceiling structures in conventions centers and airports
Convention Center Tehran: Steel Structure porously built for heavy industrial exhibitor on all three floors.
World Market Center Las Vegas Steel Structure based on a Joint Venture.
16 Floors of expo center for furniture market
Steel/Concrete skeleton structure for Airports and Hangars
32Group has developed and built over 50 high rises for commercial and residential purposes
Over 3,2 million square meters of high-rise residential has been built in Tehran, Dubai, Istanbul, Stuttgart, Montreal, Calgary, Las Vegas, and Vancouver.